Featured Work

What shipped, in full

The homepage shows a card and a few bullet points. These are the full stories behind the strongest pieces of work — what actually happened, what broke, and what it took to fix it properly.

Featured Work

September – October 2026 · Six stacked changes · partly in review

Letting AI Agents Into a Twenty-Year-Old Product, Safely

A standard OAuth sign-in for AI agents, a token that works only where it should, tools that follow the customer’s permissions, and an audit of the API around them.

Read the full writeup →

Featured Work

July 2026 · In progress

Reworking Client Numbering to Support Alphanumeric IDs, End to End

An enterprise client running SAP alongside TEAMBOX needed the same alphanumeric client codes in both systems — a change that touches nearly everything client-numbering ever touches, including an architecture correction made mid-build once the domain model demanded it.

Read the full writeup →

Featured Work

June – September 2026 · Four phases, still in review

Migrating a Legacy PHP Test Suite to Pest — Four Phases, and a Pull Request That Outgrew Its Own Plan

Rewriting the test suite was the mechanical part. The real payoff was what running tests together instead of in isolation surfaced — a different real bug in nearly every module, then an end-to-end suite, a CI topology that took five attempts, and a branch that outgrew its own estimate.

Read the full writeup →

Featured Work

June – September 2026 · Three phases · in review

Replacing a Homegrown Migration System — and Making Sure It Can’t Empty Production

Deleting the old schema-migration system was the easy part. Making sure its replacement cannot quietly empty a production database took longer.

Read the full writeup →

Featured Work

June – July 2026 · Two phases

Evaluating a Third-Party AI Development Platform Against Real CI and Security Needs — Not a Demo

A structured, honest vendor evaluation: four concrete gaps found and written up specifically, real CI hardening kept regardless of the verdict, and feedback rewritten to be constructive once the first draft read as just critical.

Read the full writeup →